The project was over 7 floors, and began with a complete strip out exposing the existing structure, demolition works and structural alterations.
The scheme consisted of all new exposed M&E services, new lighting and controls, exposing of original brickwork, steelwork features and raised metal pan flooring. The works also included creating a new reception, with feature lighting, new WC facilities and basement cycle storage with shower rooms and enhancement to the staircase.