Artemis Interiors were appointed to undertake the refurbishment of an entire existing commercial property to CAT A standard located at 123 Pall Mall, London.
The overall scope involved new office space and toilets on the ground to fifth floors, new toilet facilities on each floor, creation of reception area on the ground floor and toilet and shower facilities in the basement along with bicycle rack installation and a cycle lift. New mechanical, electrical and plumbing systems throughout, including roof top plant and underground drainage in the basement.
New architectural finishes included accessible ceilings throughout the office areas, specialist joinery, new raised flooring, decorations throughout, floor finishes to the main areas and escape stairs, full lift car refurbishment and new roof light.
Minor external stone repairs, along with minor repair to the existing windows and selected re-roofing works formed part of the scope.